Photo description:
Jon Friesen, an engineer working on the Wawanesa Dam, and Laura Robson, an engineer with Manitoba Transportation and Infrastructure, visited Wawanesa last week. The open house meeting was held to inform the public that engineers have chosen a design plan for the next Wawanesa dam. The bulk of construction is expected in fall of 2027. (Connor McDowell/The Brandon Sun)








